Home » Blog »»

Electric Utility Concerns → DTaaS Solutions

**1. Grid Modernization & Aging Infrastructure**

**Problem:** Which 10,000 assets fail first?

**Solution:** Automated condition assessment from mobile mapping + LiDAR predicts failure probability

**Benefit:** Prioritize $200M CAPEX with risk-ranked lists; extend asset life 15-20%; defend rate cases with physics-based evidence

 

## **2. DER Integration**

**Problem:** Can feeders handle 500 solar interconnections?

**Solution:** Digital twin conflates electrical + geospatial models for real-time hosting capacity

**Benefit:** Accelerate interconnections 6 months→2 weeks; defer $50M substation upgrades; monetize grid flexibility

 

## **3. Cybersecurity & Physical Security**

**Problem:** Blind if SCADA compromised; which substations most critical?

**Solution:** Air-gapped digital twin for scenario planning; forensic-grade facility documentation

**Benefit:** 60% faster incident response; prioritize $80M security hardening; pass NERC CIP audits

 

## **4. Extreme Weather & Resilience**

**Problem:** Which 10,000 poles snap in next hurricane?

**Solution:** Physics-based failure prediction 48hrs ahead; automated post-storm damage assessment

**Benefit:** Reduce SAIDI 30-40%; cut storm costs $5-8M/event; justify $100M+ resilience CAPEX

 

## **5. Workforce Crisis**

**Problem:** Retiring engineers take tribal knowledge with them

**Solution:** Immersive 3D asset library + VR training; queryable knowledge base

**Benefit:** 50% faster training; capture institutional knowledge; cut contractor dependence 30%

 

## **6. Regulatory & Rate Recovery**

**Problem:** Commissioners disallow 40% of $500M rate case

**Solution:** Risk-quantified investment portfolios with georeferenced evidence

**Benefit:** Reduce disallowances 50-70%; compress rate case prep 40%; win performance-based rates

 

## **7. Vegetation Management & Wildfire Liability**

**Problem:** $2B wildfire settlement risk; $1200/mile/year ROW costs

**Solution:** Sub-meter LiDAR encroachment detection; automated YOLO risk classification; growth modeling

**Benefit:** Cut veg spend 25%; prove NERC compliance; eliminate ignition risk; process 1000x faster than manual

 

## **8. Energy Transition & Stranded Assets**

**Problem:** Which $500M in generation assets become uneconomic?

**Solution:** Load forecasting + DER scenario modeling; asset utilization optimization

**Benefit:** Avoid $100M+ stranded investment; optimize retirement schedules; quantify electrification impacts

 

## **9. Customer Expectations & Competition**

**Problem:** Amazon-level service expectations; rooftop solar threatens revenue

**Solution:** Real-time outage prediction; proactive customer notifications; DER value stacking

**Benefit:** Improve reliability scores 20-30%; reduce call center volume 40%; retain high-value customers

 

## **10. Data Overload & Analytics Gaps**

**Problem:** Drowning in AMI/SCADA data but can’t make decisions

**Solution:** Digital twin integrates 15+ data sources into actionable intelligence layer

**Benefit:** Turn data into decisions in hours vs. months; automate 70% of routine analysis; enable AI/ML at scale

## **ROI Summary (150k Customer Utility)**

– Vegetation: $2-3M/year

– Storm response: $5-8M/event

– Asset failures: $8-12M/year

– Rate case: $1-2M/cycle

– **Total: $16-25M annual value at $500k-1M DTaaS subscription = 16-25x ROI**